Monday, September 27, 2010

Garage Slab and Other Concrete Adventures

Finished Garage Slab


Last Tuesday, we managed to pull together the pour for our garage, and two smaller landings and steps inside the house. We spent the week before excavating more dirt, replacing it with gravel, building forms, laying welded wire and rebar, placing dough-bies (?), and so on. In all, the day was really three small pour projects: a landing and stair between the garage and mudroom, a landing and stair between the hall and our bedroom, the battery storage box for our off-grid power system, plus the garage floor itself.

Prepped and Ready

The garage floor is such a relief to have done. This partly has to do with how the cats had decided the dirt/sand/gravel that was there before was an ideal litter box (pee-yew!). But also, now we can actually organize and store things in the space, knowing that we don't have to move everything out at some future date.

Greg Smith was our finisher, and we also had Mikey on hand to do some finishing, along with Karl, Aaron, myself, and Drew, to supervise and look on, with his broken collarbone not allowing him to work.

All in all, most things went smoothly on Tuesday. There were a few hiccups, as there always are on a pour day. But really nothing major. I'm happy with the results. I was telling Greg Smith, our concrete finisher, how great concrete projects are because by nature, you can't leave work till later. It's a lot to get it ready, but once you pour and finish, it's D.O.N.E. Then you get to sit back and enjoy the results.

The Landing into our bedroom



Filling Up the Landing into the Mudroom from the Garage



One quarter there in the garage



Finishing the Garage Slab



Finished Landing Inside the Mudroom



The Finished Landing into Our Bedroom

No comments: